Engine saga

Diesel: Working! I managed to find someone (Discount Marine Source.com) that had the offending dipstick tube. They express shipped that to us and I got it in today. So our main engine seems to be working pretty well right now.

Outboard: Not such a happy story. The shop says it needs a new carburetor. It’s only a couple of years old so I’m hoping it’s covered by warranty (Honda). Best case scenario is that we get it back by the end of next week.

Plan: Who needs an outboard motor? I think we’re going to leave Sunday or Monday morning. We’ll head over to Cuttyhunk for a few days. I’ve got oars. Hopefully the engine gets done in a few days. Then we’ll sail back to Dartmouth, pick it up, and head off again.

Setback

The goal was to leave by August 1st (today), but a few unexpected things happened.

1- After launching Catalpa I decided to take the dingy out to locate our mooring as we were moved to some deeper water last winter. I brought our little Honda outboard out of winter storage but wasn’t able to get it started. I spent a day or so fooling around with it but still wasn’t able to get it going. I brought it to a mechanic. They have to rebuild the carburetor and I should get it back by Friday.

2- After resolving the outboard dilemma I opened Catalpa’s engine hatch, for some reason, only to find oil pooling under the engine.  Big problem. I think its leaking from the dipstick tube which is very rusted. Apparently it must have cracked when we took our first run through the harbor to get to the mooring. I’m not much of a diesel mechanic but it looks like it’s only 2 bolts holding the thing on the engine so I figure I might be capable of replacing it. Unfortunately, our local distributor says it’s going to take two weeks to get the part from the factory. I spent half the day trying to locate the part elsewhere in the US and have it express shipped to us. I’m currently waiting on this.

IF I get the part, AND I can install it, AND I get the outboard back then I’m hoping to leave Saturday or Sunday. As I mentioned before – big problem.

Launch Day

After some very long 16 hour days, Catalpa is in. It would have been very easy for me to delay a few more weeks but a deadline is a deadline! “Time and Tide waits for no man!” The heat on Tuesday was ridiculous. Every once in a while we’d have a thunder shower but it only seemed to increase the humidity.

Our Day started at around 4:50am. At first light I was out putting bottom paint on the hull. Lynne spent most of the morning loading the boat. Caffeine was a necessary part of the morning’s festivities. The truck was at our house at 8:00 am to load Catalpa up.

Davis and Tripp did a good job of getting her out of my yard. I built the shed around the boat so I wasn’t 100% sure they were going to fit the boat out. I had a chainsaw handy. It was a tight squeeze due to the grade of the land but eventually she was out of the shed and on her way to the waterfront.

They picked Catalpa up with a big crane and put her into the water.

The rest of my day was spent rigging and sorting through some of the stuff in the cabin. Later in the day we motored around the harbor to make sure our old Diesel was still chugging away. Eventually we made it up river to our mooring.

Next- a few days of well deserved sleep!

Almost Done

After a lot of work there is light at the end of the tunnel. I have scheduled Catalpa’s launch for next Wednesday, July 25. We’ve been working diligently to complete as much as we can before splash day. Frequently temperatures in the shed are well over 100 degrees so I’m generally up at 5:00am working. I put a thermometer up on deck and it reached 109 a few days ago. HOT!

After the primer was completed I again sanded the boat and applied 4 coats of System 3 LPU paint. The paint job is not perfect. There are some brush marks and bugs but in general, I’m happy with it.

The paint seems very hard and durable so I feel it will last a long time. This paint was applied to all of the areas that don’t get non-skid paint (SKID?). So the skid is a shiny white.

After this was completed I re-taped for non-skid. For this I used a product called Kiwi-Grip.

This is a water based product that goes on very thick with a notched trowel and is then rolled out with a special roller. I’m pretty impressed with how it came out. The only problem I’ve had is that it seemed to have taken a long time to completely dry. Therefore, some of it got a little dinged up in the work that followed. If it needs it, I’ll roll on another coat next winter. I like the texture and color. I hope it holds up well.

My poor shed is going to pieces. I’ve cut many holes in it to try to vent out some of the heat. The other day I ripped

the whole front wall off. It’s done its job and held up really well through windy days and winter squalls. I’ve enjoyed having a huge hangar to work on my boat in but it will be nice to get the yard back.

 

We’ve re-bedded most of the hardware that was removed from the deck. Now I’m just checking a bunch of small stuff off of the list. The one additional large job that I decided to add was stripping and redoing the teak. I’ve got 2 coats of “Cetol Marine” down and one or two more before launch day. Normally, I use Epifanes Varnish but I decided to try something new. In the past Cetol always

looked a bit too orange to me but this is their natural teak formulation. It’s more of a light brown tint.

I can’t wait to get out on the water.

Primer

Things are starting to look a little better. Over the past few days I did a ton of sanding and fairing. My longboard is now welded to my arm and my finger tips are sanded off. I could have done some more filling and fairing but I decided to call it “DONE”.

For primer, I decided to use “Interlux Interprotect 2000E with micro plates”. Try to say that 10 times fast. It’s not really a traditional top sides primer. It’s normally used under the waterline as a barriercoat to prevent osmotic blistering. I liked the big name and the fact that it is billed as a barrier coat. It’s a 2 part epoxy with some heavy duty solvents. I’ve had to where a respirator while working with it.

It took quite a while to get all of the dust off of Catalpa. I bought a new HEPA filter for my shop-vac and wiped her down with alcohol several times. I rolled the decks and painted the cabin house with a good brush. The first coat covered all of the cracks in the deck. I intend to get at least three coats over all of the critical areas.

The taping took more time than the actual painting. My co-captain took over the taping duties so I could get away from it for a little while.

The primer is going down fairly smooth. I’ve had to add extra solvents to it due to the heat. Once this is done, it’s back to sanding again. Then onto gloss paint.

Fairing the deck

Over the past few days I’ve had some opportunity to do a bit of thinking. What percentage of my life has been spent sanding something? I bet that it is a pretty big number. I sand everything. Every single thing I have ever created has been sanded. You’d think I enjoy sanding. I don’t. Over the winter I started brewing beer as a hobby. Beer doesn’t get sanded and it helps relieve some of the pain created by sanding all day.

The deck work is progressing. I’ve patched the large areas with new balsa and three layers of fiberglass. All of the various drying holes have been plugged too. The deck has a lot of uneven areas due to repair work and grinding the original non-skid gelcoat off.

In the first couple of pictures you can see the most recent application of epoxy based fairing compound.

This stuff goes on the deck and then you basically sand most of it off so it fills in the low spots. I use a big 6″ random orbit sander and a long-board. I made the long-board by gluing a  40grit belt (belt sander) to a piece of plywood. It works well and also promotes a good upper body workout.

The last 2 photos are post-sanding. I still have one or two more coats of fairing and then the first coat of epoxy primer.

Big Fiberglass Mess

Work has progressed slowly since my last update. The New England winter was pretty mild this year. I probably would have been able to complete most of my project but it has been a busy winter. As often happens, the boat work was delayed.

The main reason for enclosing Catalpa was to explore and repair the extensive deck damage. The deck consists of a top and bottom layer of fiberglass that encapsulates a balsa wood core. The gel-coat that covers the deck is very thick but unfortunately the top layer of fiberglass is very thin. This top layer has got many stress cracks in it. This allows water to penetrate into the balsa core which creates all sorts of problems. With the help of a moisture meter, and by drilling core samples, I was able to find the extent of the problems.

Back in November I started cutting into the deck. Where I found rotten balsa, I completely removed the top skin and the balsa core. In areas where I found high moisture, but the balsa was intact, I decided to drill the deck with many holes to allow the moisture to escape the core material. Essentially the deck has been drying out for the last six months or so. It worked well. I checked everything again with the moisture meter and it is dry.

Next step in the process is to grind all of the gel-coat nonskid off of the deck I can’t match the many numerous repairs with the old nonskid so I plan on replacing it with a product called Kiwigrip. More on that later.

Anyway the deck grinding continues on. The shed is acting like a greenhouse now so the temps are probably close to 90 degrees around mid day. Add to that a hooded tyvek suit, dust mask, and ear muffs, you get a very disgruntled boat worker. Most of the destructive work is done. I’ll soon be moving on to fixing things. My goal is to launch by mid July.

Plastic walls

I closed in the shed last week. After much debate, I decided to use regular 6mil construction plastic to cover it. My other option was greenhouse plastic. Construction plastic has no UV resistance, greenhouse plastic does and lasts 4 years or more. I intend to have Catalpa back in the water next summer so I think the construction plastic will hold up for that long. It was half the price.

Hanging the plastic on the frames was a frustrating and difficult job. The pieces for the sides were 32 x 20. I should have enlisted help but I needed to get it done. I had about a two day window where there was no wind. This time of year we seem to have ‘small craft advisories’ every day. Putting up the plastic in 30+ knots of wind would have been impossible. The day after I finished it the wind went up to 40 and it held together. We have some kind of winter storm advisory for this weekend so the shed is going to get tested again.

I still have a few things to do on it. I’m having condensation issues on the inside so I’m going to hang some more plastic to keep the moisture away from the deck.

I was able to winterize the motor and get a few small projects done so some of my boat work has started. It feels good to actually start working on the boat and not the shed. Naturally the shed took up twice the amount of time and probably cost more than I anticipated. As a rule any boat related project seems to go that way so I’m not surprised.

Framing the shed

Bow production went well this time with the stock that I milled. It took around two days to make up everything. I broke a couple pieces but they mostly went together with no problems. The leaves are coming off the trees so I’d like to get the shed closed in before fall is in full swing. It has a nice looking shape to it. Boat Cathedral? Next I have to frame the end walls.

After looking at the amount of room I have in the shed I’ve decided to build staging all the way around the boat so I can work on the deck from chest height instead of kneeling on it as I work.

A side note- A few weeks ago Lynne and I went over to the Newport Boat Show. While there I was checking out some of the hardware in the Suncor Stainless booth. They asked me to take a nautical trivia quiz. I’m not big on trivia but I do read alot of nautical books. They called to inform me that I answered the most questions and won $500 worth of gear!!! Thankyou Suncor!

Plan B,C,D,etc…

Not being one to just give up I broke about 20 more straps. Plan B- was to steam bend these straps. Sounds crazy but I have done a bunch of steam bending in the past and have the gear. Steam bending is used to make boat ribs, chair arms, and other various curved pieces. Didn’t work. I’m not really sure why but these furring strips just refuse to bend.

On to the next plan. I headed over to Fairhaven lumber for some quality wood. They allowed me to pick out a bunch of 14′ 2 x 6s. It’s great going to a real lumber yard. I wish more existed. Sadly the big box stores are putting them out of business. Anyway, I ripped all of these pieces down to strapping size.

I rip cut the 2 x6 down the middle and then took these pieces and ripped them on edge to get strapping that measures 3/4 thick by 2 3/4″.

 

Once I got the saw all set up it went pretty quickly. Maybe now I’ll have some decent bows